Advanced thermo therapy equipment, such as community heat treatment oven, multi-use thermo therapy oven, and so forth. Our business pays certain attention to customers’ needs, listening to the distinct needs of each client and guaranteeing total satisfaction. Excellent interest has been paid on environmental safety and strength conserving. one.Description
Solution title | OEM grey/ductile/bronze sand casting EPT human body part |
Application | EPT sector, EPTTry components, EPT EPTTry, contruction industry and so on. |
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rds accessible | ductile iron, gray iron,carbon metal, alloy metal, stainless steel etc. |
Production method | sand castiing, investment casting,precision casting, machining and so on. |
Size | EPT by your need . |
Acceptable drawing formats | DWG,DXF,IGES,STEPT,PDF |
EPTT | StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd export plywood scenario . |
Supply time | 30 daEPTTnormally. |
Payment | T/T, L/C,D/P,Paypal. |
Port | EPTTngdao, EPTT |
Certifications | ISO90012008 |
Main Market place | North of The united states, Australia, Middle EPT and so forth. |
Creation ability | 10,000,000 pcs/calendar year |
2. Bulk oeder
three. Sand casting equipment
Plant has big-scale casting products of 50 sets, we have distinct EPT with diverse sort
of sand sort and parts condition. The premier casting we can solid is fifteen tons. Our annually ability for
sand casting is about 2000 tons for solid metal and 30000 tons for cast iron.
four.Inspection method:
In orEPTTto make sure the quality of the orders, our impartial QC customers to have out rigorous inspection
Certificate
5.EPTT amp EPT
1.) picket, carton
two.) pallet
three.) as customers’ prerequisite.
6.FAQ
1. How can I get thequotation?
Remember to ship us info for estimate: drawing, content, fat, quantity and ask for.
- two. If we never have drawing, can you make drawing for me?
Yes, we make the drawing of your sample and replicate the sample.
- 3. When can I get thesample?
Sample: twenty five-30 days after you start off to make mildew. The precise time is dependent on your solution.
- four. What is your main orEPTTtime?
OrEPTTtime: 35-40 times after the payment. The accurate time is dependent on your solution.
- 5. What is yourpayment method?
EPT: one hundred% TT EPTd.
Main order: fifty% deposit, equilibrium 50% to be compensated ahead of cargo.
- six. Which sort of file format you can go through?
PDF, ISGS, DWG, STEPT, MAX..